ZHANG Yi-qun, WANG Ting. Study on Discounted Flow Time-Cost Model and Ant Colony Optimization Considering Subcontract Payment[J]. Journal of nanchang hangkong university(Natural science edition), 2017, 31(2): 26-33. DOI: 10.3969/j.issn.1001-4926.2017.02.005
Citation: ZHANG Yi-qun, WANG Ting. Study on Discounted Flow Time-Cost Model and Ant Colony Optimization Considering Subcontract Payment[J]. Journal of nanchang hangkong university(Natural science edition), 2017, 31(2): 26-33. DOI: 10.3969/j.issn.1001-4926.2017.02.005

Study on Discounted Flow Time-Cost Model and Ant Colony Optimization Considering Subcontract Payment

  • The non-subject professional subcontract is an important part of the current "Design-Build model", which greatly improves the modern professional project management system, but the current research on project subcontract management has not yet taken into account the impact of the time value of subcontracting funds on project benefits. Aiming at this problem, the discounted flow time-cost problem model considering subcontracting been proposed on this paper. Combining the ant colony algorithm with heuristic parallel computing mechanism, the optimal net present value under different resource constraints is optimized. The study shows that, when considering the subcontract payment situation, we can get more valuable project scheduling plan, and reduce the project construction costs while improving the production efficiency.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return